Daily Trade News

Texan Bitcoin mining power demands could jump 5 times by 2023 By



© Reuters.

As the state of Texas faces a rapid influx of mining operations, its electrical infrastructure will have to support the industry’s expected 5,000 megawatts (MW) of additional power demands by 2023.

The Bitcoin mining industry in Texas currently consumes around 500 to 1,000 MW of power. The Electric Reliability Council of Texas (ERCOT) anticipates that demand could increase as much as fivefold by 2023 and has planned an additional 3,000 to 5,000 MW according to reports.